PROJECT SITE

Vis Viva is being developed in collaboration with the Municipality of Hrvace in the wider area of the Peruća storage reservoir. The site was chosen based on the following criteria:

Strong interest and support of the local community for the implementation of developmental projects in a region where no significant investment was made for many years

Compliance with the Split-Dalmatia County Developmental Strategy – planned construction of significant renewable energy capacity in the wider area

Proximity of the accumulation lake, water needed for cooling combined-cycle cogeneration natural gas power plant

Benefits of the location for construction of Vrdovo Pumped-storage hydropower plant

Relatively small distance from the main pipeline in Dugopolje

Relatively small distance from Konjsko TS – the largest network transmission facility in Dalmatia

PROJECT IMPLEMENTATION

2014

Preparation of Expert Technical Documentation

Harmonization of Spatial Planning Documents

2015

Preparation of Expert Technical Documentation

Harmonization of Spatial Planning Documents

Implementation of exploration and surveying work

Preparation of Environmental Impact Reports and Impact Studies on Special Protection Areas

Resolution of Property-Legal Relations

2016

Environmental Impact Assessments –Ministry of Environment and Nature ‘s EIA Decisions

Obtaining location permits

Resolution of Property-Legal Relations

Preparation of tender documentation and issuing a tender for strategic partner (investor)

Preparation of Conceptual and Detail Design

Feasibility Study preparation

2017

Issuing an EPC tender

Building permits

Start of Construction Works

2020

Use permits

CCNGT Peruća, transmission line and pipeline work to start

2022

Use permit

PSP Vrdovo work to start