Logo Logo Logo Logo Logo
  • English
    • Croatian
  • Home
  • Energy today and tomorrow
  • About the project
    • Project location and implementation
    • CCGT Peruća
    • PHSP Vrdovo
    • Connecting Pipeline
    • Transmission Line
  • Dialogue
    • Documentation
  • News
  • Home
  • Energy today and tomorrow
  • About the project
    • Project location and implementation
    • CCGT Peruća
    • PHSP Vrdovo
    • Connecting Pipeline
    • Transmission Line
  • Dialogue
    • Documentation
  • News
 

Documentation

  • 3D VISUALIZATION
  • DECISIONS
  • PRESENTATIONS
  • NON-TECHNICAL SUMMARIES

16.10.2015. – Peruća Combined-cycle Gas Turbine (CCGT) [PDF 1.06 MB]

27.08.2015. – Dugopolje-Peruća Connecting Pipeline [PDF 1.04 MB]

26.08.2015. – 2×400 kV Hrvace-Konjsko Transmission Line with 400/110kV Switchyard Hrvace [PDF 1.18 MB]

2.12.2015. – Compliance with valid spatial planning documents [PDF 4 MB]

Vis Viva Project Presentation

DOWNLOAD

Non-technical summaries of environmental impact studies will be published as soon as possible.

© 2017 | All rights reserved MCC and Vrdovo reverzbilne hidroelektrane | Telephone: 098 352 566 | E-mail: informacije@vis-viva-energija.com